Following an early Easter I returned to St Catherine’s church in Mile Cross, cutting out and repointing to the church’s north and south porches, and repairing the dance studio ceiling in the church hall.
The rest of the month I’ve been in the process of re-vamping outbuildings to a property in Hedenham. These works include cutting out internal walls, forming trusses into the roof, cutting and fitting a new canopy roof, stripping off all the old tiles, felt and battens, then fitting new felt, battens, Velux roof windows, and re-tiling the roof using as many original tiles as possible.