The end of April and early part of May has been pretty full-on, as the main building works began at Lyng. The front bedroom en suite is now complete, with new toilet, sink unit, large shower enclosure, lights, extractor fan, and flooring:- just the decorating outstanding.
The existing first floor bathroom has been completely ripped out. New wiring has been installed and it has been plastered, with the new bathroom being fitted this week.
Major works have started on the kitchen and dining room: the existing wall between the two has been removed, and a large RSJ installed. The wiring, alterations and plumbing for the new layout have been completed. The walls, ceilings and beam have been plasterboarded ready for plastering.
Here are a few photos of work in progress:-
Any jobs the wife is hoping I might get time for are currently on hold!