September was a very busy month both physically and mentally as full works started on 2 extensions, a new porch, and internal building works at Croft Green, Attleborough.
Work began by demolishing the existing conservatory and rear extension:-
Footings were dug, concreted, and concrete blocks laid:-
New drainage runs and soakaway were dug out, drains cut, laid and backfilled. The existing old mains drain runs were also replaced:-
Insulation, damp proof membrane, hardcore and concrete completed the slabs. The final week of the month saw timber studwork walls and roof of the porch being cut and fitted, whilst a new patio and path were also laid:-